成人免费av I 亚洲视频中文字幕 I 日本久久久久久久 I 五月婷在线 I 在线看h片 I 朝桐光在线视频 I 国产麻豆自拍 I 欧美日韩综合视频 I 成人看的视频 I 一个人看的www片免费高清中文 I 涩涩视频软件 I 人人人人你人人人人 I 人人艹视频 I 一级大黄毛片 I 黄色www网站 I 欧美大片在线观看一区二区 I 久久精品专区 I 伊人日日夜夜 I 巨大胸大乳奶电影 I 自拍第一区 I 91性感美女视频 I 人人爱天天操 I 尤物视频观看 I 久久人人爽人人爽人人片av I 中文字幕 国产一区 I 国产色视频网免费 I 欧美日韩国产欧 I 国产9色视频

中文版

Your location: Home > News > Industry news
News

Company news Industry news
What is terminal aging test? Terminal aging test methods and standards

Terminal block is a kind of accessory product used to realize electrical connection. Its scope of use and types are more and more. At present, it is widely used in power engineering control, machine equipment control, automation control, intelligent security control, instrument equipment and other industries!

What is terminal aging test?

Wiring terminal aging test: it is to judge the service life of the wiring terminal. If the aging is fast, the service life will be short, and if the aging is slow, the service life will be long. Terminal aging test can effectively evaluate the quality of products by detecting the electrical connection quality of products.

Terminal aging test methods and standards

1. install 5 terminals horizontally on a guide rail, and connect them with wires with rated cross-sectional area. The connecting wires shall be at least 300mm long, and then measure the voltage drop of each terminal;

2. the lower and upper temperature limits in the aging box are set to 20 ℃ and 75 ℃ respectively;

3. the rated current flows through the heating phase and the continuous phase of 10min after reaching the higher temperature. In this way, the test piece will reach the higher allowable working temperature. Here, we should clearly know that the higher maximum temperature is 120 ℃.

4. the next step is the cooling process. In the cooling state after every 24 heating and cooling cycles, the voltage drop is measured once. The whole test process has 192 cycles.

5. the voltage drop before the test shall not exceed 3.2mv, the voltage drop during and after the test shall not exceed 4.8mv, and the measured value after 24 cycles shall not exceed 1.5 times of the initial value before the test.

Copyright © 2022 YUEQING JIANHONG ELECTRICAL ELECTRON CO.,LTD. All Right Reserved.   浙ICP備11051690號-1   Website maintenance: ewwwe